Monday, December 5, 2011

Weeks 13 & 14 - Finishing Touches part 1

So 2 weeks ago I had a list of things that were supposed to be happening in weeks 13 & 14. The only 2 that didn't happen are cabinet install and starting the carport. Here's what we're hoping for in the next 2 weeks.



  • start the carport

  • install cabinets

  • finish trim (still need to do window and door casings)

  • wrap up painting

  • template for granite

  • start finishing electrical and plumbing

Here's what we did get done the past 2 weeks.


1.) This is taken from the dining room, through the kitchen and den. Crown is all hung and walls are primed. The primer is tinited, but this isn't far off from our overall wall color



2.) Fireplace. Kitchen to the right, french doors to deck to the left
3.) One of the upstairs bedrooms
4.) One of the upstairs baths. Tile still needs to be grouted and walls painted.





5.) Master shower. Half wall will be tiled and have frameless glass shower door installed on top.


6.) Back view. Deck might get an Emily and Matt stain job, but at least it's up. We still need gutters and exterior lights back here.



7.) Taken from family room through hall to foyer.


8.) Taken from den, showing kitchen and through to front hall


9.) Stairs.