Sunday, November 20, 2011

Putting the Walls Up - Weeks 11 & 12

It's been a busy couple of weeks at the house. We passed all of our rough in inspections on the first try which was nice. Kevin was out of town this past week, but all still went smoothly. After we passed all rough ins, and framing, they installed the insulation and siding. Insulation passed, they hung and taped drywall. Dry wall still needs to be finished, but it's getting closer. The siding has been caulked and they've started painting. We've decided to go on a barely off white.


In the next 2 weeks, we're hoping to:


  • start the carport

  • build the deck

  • install hardwood floors

  • install tile

  • start putting up trim

  • start painting

  • install cabinets

1.) view from front door. 2.) Family room. Fireplace installed. Nooks on each side are for built ins 3.) Master bedroom 4.) Master bath





5.) Man Room


6.) Front view


7.) Another front/side view

8.) Back view